A shared exchange history
Source, destination and operation status in one place, with each failed exchange linked to its originating event.
INTEGRATIONS / APIs / DATA EXCHANGE
Your systems start working together.
We are developing a shared control point for data exchange between applications. CONNECT is intended to link systems, show transfer history and help teams resolve errors without comparing multiple dashboards.
Delivery preparation
As of 28 October 2026We have prepared the project identity, first-version scope and acceptance criteria. The next stage is to build and verify the described journey with a partner. Timing will be agreed for the selected deployment.
Who are we building this for?
An order is ready in one system while another is still waiting for its data. Teams retype information, check statuses and investigate mismatches. The first CONNECT deployment will focus on one such flow.
Integration platform / Rewinit CONNECT
Source, destination and operation status in one place, with each failed exchange linked to its originating event.
Agreed fields and validation before transmission are intended to reduce manual corrections.
Retries and duplicate protection are designed to help restore the flow after an interruption.
Choose successive steps to see how the project’s first application is intended to work.
Rewinit CONNECT / 01
Example scenario
Order TEST-104 becomes ready in the source application.
Planned outcome
The first adapter receives its identifier and the agreed fields.
An example scenario using prepared data. This presentation illustrates the planned process; it does not operate external systems.
Each stage follows verification of the previous outcome. The pilot scope will be agreed with a partner.
Prepared
Project mark, visual direction, audience, first-deployment scope and acceptance criteria.
Next stage
Two adapters, one mapping and an exchange history panel for one direction of data transfer.
A valid event reaches its destination; a missing field produces a visible error, and retrying after an interruption creates no duplicate.
Planned stage
Verify the flow in the partner’s test environments, then review an agreed sample of events.
Planned stage
Versioned adapters, agreed monitoring and procedures for errors and API changes.
Rewinit CONNECT / DEVELOPMENT
We have prepared the project mark and visual identity and defined its audience, first scenario, milestones and acceptance criteria. The delivery plan describes the next outcome to verify.
Project identity
A distinct mark and colour within the shared Rewinit system. The identity accompanies the project from planning to first-deployment materials.
Download SVG logoRewinit CONNECT / PARTNERS
We are seeking a partner to adapt the scope to a specific process and evaluate the outcome in a pilot.
Discuss CONNECT